Optima 2.0, Wadgaon Budruk
by M/S. Soba Associates. Wadgaon Budruk, Pune 411041. View on Google Maps
- Launched
- 7 years originally promised
- Possession date (MahaRERA)
- 2 months awayExtended by 1 year (originally December 2025). Why possession dates change
- Concrete structure (RCC)
- 100%Nearing possessionAverage across 2 buildings
- Units booked
- 162 of 17792% booked
Project facts
| 2 BHK | 83 |
|---|---|
| 3 BHK | 82 |
| Other units (shops, offices or not given by type) | 12 |
| Total units | 177 |
| Buildings | 2 |
| Land | 0.4 acres |
| Complaints on MahaRERA (filed by or against the builder) | 9 |
Since Dec 2025: booked 160 → 162 · final finishes 40% → 75% · possession date December 2025 → December 2026 · complaints 1 → 9
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 100% | 75% | 162 | |
| 100% | 100% | 40% | 160 | |
| 100% | 100% | 0% | 107 | |
| 100% | 80% | 0% | 71 |
"—" means MahaRERA shows no figure for that update.
About this project
Optima 2.0 (MahaRERA P52100018793) is a residential project by M/S. Soba Associates in Wadgaon Budruk, Pune 411041. It was launched in December 2018. It has 177 units in 2 buildings: 165 homes (2 & 3 BHK) and 12 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, extended by 1 year from the original December 2025. Construction, averaged across its 2 buildings: excavation complete, structure (RCC) complete, final finishes 75% complete. MahaRERA records do not show it as ready to move in.
162 of its 177 units are booked (92%). Since the December 2025 update, 2 more units have been booked and the possession date has moved from December 2025 to December 2026.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.