Sharada Myria, Kirkatwadi
by Sharada Erectors Private Limited. Kirkatwadi, Pune 411024. View on Google Maps
- Launched
- First of 2 phases
- Possession dates (MahaRERA)
- Jun 20321 of 2 phases have an extended possession date. Reading a project's possession date
- Concrete structure (RCC)
- 81%Mid-construction1 of 2 phases with structure completeWeighted across 2 phases
- Units booked
- 135 of 17478% booked · 1 phase not reported
Facts
Project facts
| 1 RK | 4 |
|---|---|
| 1 BHK | 89 |
| 2 BHK | 30 |
| 3 BHK | 35 |
| 4 BHK | 14 |
| Total units | 206 |
| Buildings | 3 |
| Land | 3.8 acres |
| Phases | 2 |
| MahaRERA complaints (filed by or against the builder) | 0 |
Shortlist 2 or more to compare side by side.
Phases
The 2 phases
| Phase | MahaRERA no. | Flats | Possession | Structure | Booked |
|---|---|---|---|---|---|
| Sharada Myria B and C Building Completed | P52100018973 | 136 | 100% | 78% | |
| Sharada Myria Wing C Early stage | PR1260002500498 | 32 | 0% | Not reported |
Show updates by phase
Sharada Myria B and C Building (P52100018973)
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 55% | 48% | 25% | 135 | |
| 55% | 10% | 0% | 44 | |
| 55% | 4% | 0% | 44 |
"—" means MahaRERA shows no figure for that update.
Sharada Myria Wing C (PR1260002500498)
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
How to read construction stages
- Early stage
- The concrete structure (RCC) has not started yet.
- Mid-construction
- The concrete structure (RCC) is being built.
- Nearing possession
- The concrete structure (RCC) is complete and final finishes are below 90%.
- Ready to move
- MahaRERA shows the project Completed, or the concrete structure (RCC) is complete and final finishes are 90% or more.
- Concrete structure (RCC)
- The reinforced-concrete frame of the building: columns, beams and slabs.
- Final finishes
- Lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- Lapsed
- MahaRERA status when the possession date has passed with no extension or completion filed; it does not by itself mean work has stopped.
About this project
Sharada Myria is a project by Sharada Erectors Private Limited in Kirkatwadi, Pune 411024, registered with MahaRERA as 2 phases (P52100018973, PR1260002500498). The first phase was launched in December 2018. Together the phases have 206 units in 3 buildings, with 1 RK, 1 BHK, 2 BHK, 3 BHK & 4 BHK homes as registered with MahaRERA. On MahaRERA, 1 is completed and 1 is active.
The registered possession date is June 2032; 1 of 2 phases have an extended possession date. Across all phases, weighted by flats, the concrete structure (RCC) is 81% complete and final finishes 20% complete. 1 of the 2 phases have their structure complete.
135 of the 174 units reported for sale are booked (78%); 1 phase has not reported bookings.