Dwarikadham, Kondhwa Budruk

by Yashodhan Affordable Landmark LLP. Kondhwa Budruk, Pune 411048. View on Google Maps

Launched
5 years 11 months originally promised
Possession date (MahaRERA)
1 year 8 months awayExtended by 3 years 6 months (originally December 2024). Why possession dates change
Concrete structure (RCC)
67%Mid-constructionAverage across 12 buildings
Units booked
602 of 1,13553% booked

Project facts

1 BHK411
2 BHK528
3 BHK152
Other units (shops, offices or not given by type)44
Total units1,135
Buildings12
Land9.3 acres
Complaints on MahaRERA (filed by or against the builder)4

Since Dec 2025: structure 64% → 67% · final finishes 100% → 66% · complaints 3 → 4

Share on WhatsApp

Construction progress

As reported to MahaRERA at each update
Time used and structure built
All of the originally promised 5 years 11 months have passed
Concrete structure (RCC) 67% complete
Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2023Jun 2024Dec 2024Jun 2025Dec 2025Jul 2026Dec 2023: Excavation 57%Jun 2024: Excavation 57%Dec 2024: Excavation 68%Jun 2025: Excavation 68%Dec 2025: Excavation 86%Jul 2026: Excavation 100%Dec 2023: Concrete structure (RCC) 55%Jun 2024: Concrete structure (RCC) 55%Dec 2024: Concrete structure (RCC) 57%Jun 2025: Concrete structure (RCC) 57%Dec 2025: Concrete structure (RCC) 64%Jul 2026: Concrete structure (RCC) 67%Dec 2023: Final finishes 36%Jun 2024: Final finishes 36%Dec 2024: Final finishes 43%Jun 2025: Final finishes 43%Dec 2025: Final finishes 100%Jul 2026: Final finishes 66%Excavation 100%Concrete structure (RCC) 67%Final finishes 66%

If a percentage drops between updates, we show it as MahaRERA reported it.

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%67%66%602
86%64%100%602
68%57%43%542
57%55%36%544

"—" means MahaRERA shows no figure for that update.

About this project

Dwarikadham (MahaRERA P52100019278) is a residential project by Yashodhan Affordable Landmark LLP in Kondhwa Budruk, Pune 411048. It was launched in January 2019. It has 1,135 units in 12 buildings: 1,091 homes (1, 2 & 3 BHK) and 44 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is June 2028, extended by 3 years 6 months from the original December 2024. Construction, averaged across its 12 buildings: excavation complete, structure (RCC) 67% complete, final finishes 66% complete. MahaRERA records do not show it as ready to move in.

602 of its 1,135 units are booked (53%). Since the December 2025 update, the reported concrete structure (RCC) has gone from 64% to 67%.

Disclaimers
  • Figures are as reported to MahaRERA, not verified by FlatNama.
  • Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
  • On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
  • Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
  • Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
  • Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
  • Rates also vary with the exact project location.
  • Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
  • Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
  • Please do your own checks before you buy.
Source: MahaRERA registration P52100019278.Check it on MahaRERA (P52100019278)All projects in Kondhwa, Yewalewadi, Pisoli