Rohan Yuva - Bldg E, Wagholi
by Rohan Buildcon. Wagholi, Pune 412207. View on Google Maps
- Launched
- 4 years 11 months originally promised
- Possession date (MahaRERA)
- 2 months awayExtended by 2 years 1 month (originally November 2024). Why possession dates change
- Concrete structure (RCC)
- 100%Nearing possession
- Units booked
- 73 of 11961% booked
Project facts
| 1 BHK | 39 |
|---|---|
| 2 BHK | 60 |
| Other units (shops, offices or not given by type) | 20 |
| Total units | 119 |
| Buildings | 1 |
| Land | 0.6 acres |
| Landowner share | 33 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: final finishes 35% → 40%
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 100% | 40% | 73 | |
| 100% | 100% | 35% | 73 | |
| 100% | 93% | 0% | 46 | |
| 100% | 70% | 0% | 46 |
"—" means MahaRERA shows no figure for that update.
Other phases of this project
About this project
Rohan Yuva - Bldg E (MahaRERA P52100023134) is a residential project by Rohan Buildcon in Wagholi, Pune 412207. It was launched in December 2019. It has 119 units in 1 building: 99 homes (1 & 2 BHK) and 20 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, extended by 2 years 1 month from the original November 2024. Construction: excavation complete, structure (RCC) complete, final finishes 40% complete. MahaRERA records do not show it as ready to move in.
73 of its 119 units are booked (61%).
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.