Kshitij Residency, Kothrud

by Yash Buildcon. Kothrud, Pune 411038. View on Google Maps

Launched
5 years 10 months originally promised
Possession date (MahaRERA)
2 months awayExtended by 1 year 2 months (originally October 2025). Why possession dates change
Concrete structure (RCC)
0%Early stageAverage across 3 buildings
Units booked
114 of 32136% booked

Project facts

1 BHK161
2 BHK106
Other units (shops, offices or not given by type)54
Total units321
Buildings3
Land0.8 acres
Rehab units147
Complaints on MahaRERA (filed by or against the builder)5

Since Dec 2025: booked 100 → 114 · final finishes 21% → 71% · complaints 2 → 5

Share on WhatsApp

Construction progress

As reported to MahaRERA at each update
Time used and structure built
All of the originally promised 5 years 10 months have passed
Concrete structure (RCC) 0% complete
Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2023Jun 2024Dec 2024Jun 2025Dec 2025Jul 2026Dec 2023: Excavation 83%Jun 2024: Excavation 83%Dec 2024: Excavation 83%Jun 2025: Excavation 83%Dec 2025: Excavation 83%Jul 2026: Excavation 100%Dec 2023: Concrete structure (RCC) 0%Jun 2024: Concrete structure (RCC) 0%Dec 2024: Concrete structure (RCC) 0%Jun 2025: Concrete structure (RCC) 0%Dec 2025: Concrete structure (RCC) 0%Jul 2026: Concrete structure (RCC) 0%Dec 2023: Final finishes 0%Jun 2024: Final finishes 0%Dec 2024: Final finishes 0%Jun 2025: Final finishes 0%Dec 2025: Final finishes 21%Jul 2026: Final finishes 71%Excavation 100%Final finishes 71%Concrete structure (RCC) 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%0%71%114
83%0%21%100
83%0%0%261

"—" means MahaRERA shows no figure for that update.

About this project

Kshitij Residency (MahaRERA P52100023369) is a residential project by Yash Buildcon in Kothrud, Pune 411038. It was launched in December 2019. It has 321 units in 3 buildings: 267 homes (1 & 2 BHK) and 54 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2026, extended by 1 year 2 months from the original October 2025. Construction, averaged across its 3 buildings: excavation complete, structure (RCC) not started, final finishes 71% complete. MahaRERA records do not show it as ready to move in.

114 of its 321 units are booked (36%). Since the December 2025 update, 14 more units have been booked.

Disclaimers
  • Figures are as reported to MahaRERA, not verified by FlatNama.
  • Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
  • On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
  • Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
  • Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
  • Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
  • Rates also vary with the exact project location.
  • Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
  • Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
  • Please do your own checks before you buy.
Source: MahaRERA registration P52100023369.Check it on MahaRERA (P52100023369)All projects in Kothrud