Pmay Scheme at Survey NO 89 Part and 92 Part Plot D, Hadapsar, TAL Haveli, Dist Pune
by Pmay Cell,pune Municipal Corporation. Hadapsar, Pune 411028. View on Google Maps
- Launched
- 5 years 8 months promised
- Possession date (MahaRERA)
- 2 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 67%Mid-constructionAverage across 3 buildings
- Units booked
- Bookings not reported
Project facts
| 1 BHK | 166 |
|---|---|
| Total units | 166 |
| Buildings | 3 |
| Land | 1.1 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Compared with 4 similar projects in PIN 411028
Projects with 80–350 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 5 yrs 8 mths | 4 yrs |
| Possession date extended | No | 3 of 4 |
| Possession date (MahaRERA) | December 2026 | June 2028 |
| Concrete structure (RCC) complete | 67% | 88% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Greenville Building A1 | February 2021 | June 2024 | 100% | 106 of 112 booked (95%) |
| Kumar Prospera - A6 | July 2021 | August 2025 | 100% | All 92 units booked |
| Anant Homes | September 2021 | December 2028 | 50% | Bookings not reported |
| Leisure Town Phase 2 | October 2020 | December 2027 | 75% | 55 of 141 booked (39%) |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 67% | 67% | 67% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Pmay Scheme at Survey NO 89 Part and 92 Part Plot D, Hadapsar, TAL Haveli, Dist Pune (MahaRERA P52100029009) is a residential project by Pmay Cell,pune Municipal Corporation in Hadapsar, Pune 411028. It was launched in April 2021. It has 166 units in 3 buildings, with 1 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, unchanged since launch. Construction, averaged across its 3 buildings: excavation 67% complete, structure (RCC) 67% complete, final finishes 67% complete. MahaRERA records do not show it as ready to move in.
It has not reported any bookings to MahaRERA yet.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.