Vasundhara Heritage, Pirangut
by Vinod Shatrughan Amale. Pirangut, Pune 412115. View on Google Maps
- Launched
- 3 years 11 months originally promised
- Possession date (MahaRERA)
- 2 months awayExtended by 1 year 3 months (originally September 2025). Why possession dates change
- Concrete structure (RCC)
- 90%Mid-construction
- Units booked
- 13 of 2552% booked
Project facts
| 1 BHK | 25 |
|---|---|
| Total units | 25 |
| Buildings | 1 |
| Land | 0.3 acres |
| Landowner share | 12 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: possession date September 2025 → December 2026
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 90% | 75% | 13 | |
| 100% | 80% | 0% | 6 | |
| 100% | 1% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Vasundhara Heritage (MahaRERA P52100031290) is a residential project by Vinod Shatrughan Amale in Pirangut, Pune 412115. It was launched in October 2021. It has 25 units in 1 building, with 1 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, extended by 1 year 3 months from the original September 2025. Construction: excavation complete, structure (RCC) 90% complete, final finishes 75% complete. MahaRERA records do not show it as ready to move in.
13 of its 25 units are booked (52%). Since the December 2025 update, the possession date has moved from September 2025 to December 2026.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.