Uttam Townscape Life HUB A,A1,B, Yerwada
by Fortune Developers and Infrastructures. Yerwada, Pune 411006. View on Google Maps
- Launched
- 2 years originally promised
- Possession date (MahaRERA)
- 2 years 2 months awayExtended by 5 years 2 months (originally October 2023). Why possession dates change
- Concrete structure (RCC)
- 19%Mid-constructionAverage across 3 buildings
- Units booked
- 5 of 1424% booked
Project facts
| 1 RK | 20 |
|---|---|
| 1 BHK | 92 |
| Other units (shops, offices or not given by type) | 30 |
| Total units | 142 |
| Buildings | 3 |
| Land | 0.8 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 95% | 19% | 0% | 5 | |
| 95% | 19% | 0% | 4 | |
| 78% | 6% | 0% | 6 | |
| 70% | 0% | 0% | 6 |
"—" means MahaRERA shows no figure for that update.
About this project
Uttam Townscape Life HUB A,A1,B (MahaRERA P52100031569) is a residential project by Fortune Developers and Infrastructures in Yerwada, Pune 411006. It was launched in October 2021. It has 142 units in 3 buildings: 112 homes (1 RK & 1 BHK) and 30 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2028, extended by 5 years 2 months from the original October 2023. Construction, averaged across its 3 buildings: excavation 95% complete, structure (RCC) 19% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
5 of its 142 units are booked (4%).
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.