Kool Homes Solitaire Phase II, Kondhwa Khurd
by Repton Properties Private Limited. Kondhwa Khurd, Pune 411048. View on Google Maps
- Launched
- 5 years 7 months originally promised
- Possession date (MahaRERA)
- 4 years 2 months awayExtended by 3 years 6 months (originally June 2027). Why possession dates change
- Concrete structure (RCC)
- 80%Mid-construction
- Units booked
- 2 of 346% booked
Project facts
| 2 BHK | 32 |
|---|---|
| 3 BHK | 2 |
| Total units | 34 |
| Buildings | 1 |
| Land | 3.7 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: structure 70% → 80% · possession date June 2027 → December 2030
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 80% | 0% | 2 | |
| 100% | 70% | 0% | — | |
| 100% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
Other phases of this project
About this project
Kool Homes Solitaire Phase II (MahaRERA P52100031679) is a residential project by Repton Properties Private Limited in Kondhwa Khurd, Pune 411048. It was launched in November 2021. It has 34 units in 1 building, with 2 & 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2030, extended by 3 years 6 months from the original June 2027. Construction: excavation complete, structure (RCC) 80% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
2 of its 34 units are booked (6%). Since the December 2025 update, the reported concrete structure (RCC) has gone from 70% to 80% and the possession date has moved from June 2027 to December 2030.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.