Shubhankar Durvaa Phase II A, Dhanori
by Atul Dnyaneshwar Bahirat. Dhanori, Pune 411015. View on Google Maps
- Launched
- 4 years 3 months originally promised
- Possession date (MahaRERA)
- 2 months awayExtended by 6 months (originally June 2026). Why possession dates change
- Concrete structure (RCC)
- 80%Mid-construction
- Units booked
- 44 of 8452% booked
Project facts
| 2 BHK | 58 |
|---|---|
| 3 BHK | 26 |
| Total units | 84 |
| Buildings | 1 |
| Land | 1.3 acres |
| Reserved units | 4 |
| Complaints on MahaRERA (filed by or against the builder) | 1 |
Since Dec 2025: booked 35 → 44 · structure 3% → 80% · possession date June 2026 → December 2026
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 80% | 0% | 44 | |
| 100% | 3% | 0% | 35 | |
| 100% | 2% | 0% | — | |
| 100% | 1% | 0% | — | |
| 100% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Shubhankar Durvaa Phase II A (MahaRERA P52100033886) is a residential project by Atul Dnyaneshwar Bahirat in Dhanori, Pune 411015. It was launched in March 2022. It has 84 units in 1 building, with 2 & 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, extended by 6 months from the original June 2026. Construction: excavation complete, structure (RCC) 80% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
44 of its 84 units are booked (52%). Since the December 2025 update, 9 more units have been booked, the reported concrete structure (RCC) has gone from 3% to 80% and the possession date has moved from June 2026 to December 2026.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.