- Launched
- 3 years 9 months promised
- Possession date (MahaRERA)
- 10 months ago. No extension recordedPossession date unchanged since launch. What "Lapsed" means
- Concrete structure (RCC)
- 90%Mid-constructionAverage across 2 buildings
- Units booked
- 136 of 15190% booked
Project facts
| 1 BHK | 27 |
|---|---|
| 2 BHK | 124 |
| Total units | 151 |
| Buildings | 2 |
| Land | 0.6 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 114 → 136 · structure 70% → 90% · final finishes 25% → 50%
Construction progress
As reported to MahaRERA at each updateIf a percentage drops between updates, we show it as MahaRERA reported it.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 90% | 50% | 136 | |
| 99% | 70% | 25% | 114 | |
| 100% | 80% | 0% | 100 | |
| 100% | 80% | 0% | 62 | |
| 100% | 10% | 0% | 48 |
"—" means MahaRERA shows no figure for that update.
About this project
Vrundavan Greens (MahaRERA P52100034086) is a residential project by Vrundavan Greens in Dighi, Pune 411015. It was launched in March 2022. It has 151 units in 2 buildings, with 1 & 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.
Possession was due in December 2025. That date has passed and no extension has been recorded. Construction, averaged across its 2 buildings: excavation complete, structure (RCC) 90% complete, final finishes 50% complete. MahaRERA records do not show it as ready to move in.
136 of its 151 units are booked (90%). Since the December 2025 update, 22 more units have been booked and the reported concrete structure (RCC) has gone from 70% to 90%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.