Astoria Royals A wing, Ravet
by Nirman Square LLP. Ravet, Pune 412101. View on Google Maps
- Launched
- 5 years 9 months promised
- Possession date (MahaRERA)
- 1 year 11 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 50%Mid-construction
- Units booked
- 108 of 14475% booked
Project facts
| 3 BHK | 99 |
|---|---|
| 4 BHK | 45 |
| Total units | 144 |
| Buildings | 1 |
| Land | 0.4 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 107 → 108 · structure 70% → 50%
Compared with 6 similar projects in PIN 412101
Projects with 70–300 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 5 yrs 9 mths | 3 yrs 4 mths |
| Possession date extended | No | 2 of 6 |
| Possession date (MahaRERA) | September 2028 | December 2026 |
| Concrete structure (RCC) complete | 50% | 100% |
| Share of units booked | 75% | 74% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Terra Greens | December 2022 | December 2026 | 95% | 93 of 180 booked (52%) |
| Alpine Astonia | November 2022 | April 2026 | 100% | 160 of 236 booked (68%) |
| Little Earth, Kiwale- Building B11 | November 2022 | December 2026 | 100% | 24 of 172 booked (14%) |
| Little Earth, Kiwale Building C16 | November 2022 | June 2025 | 100% | 112 of 115 booked (97%) |
| Om Mangalam Disha | January 2023 | September 2026 | 100% | 104 of 130 booked (80%) |
| Gini Vibrance | January 2023 | December 2026 | 100% | All 180 units booked |
Construction progress
As reported to MahaRERA at each updateIf a percentage drops between updates, we show it as MahaRERA reported it.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 50% | 0% | 108 | |
| 100% | 70% | 0% | 107 | |
| 100% | 70% | 0% | 68 | |
| 100% | 0% | 0% | 35 | |
| 0% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
Other phases of this project
About this project
Astoria Royals A wing (MahaRERA P52100048260) is a residential project by Nirman Square LLP in Ravet, Pune 412101. It was launched in December 2022. It has 144 units in 1 building, with 3 & 4 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is September 2028, unchanged since launch. Construction: excavation complete, structure (RCC) 50% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
108 of its 144 units are booked (75%). Since the December 2025 update, 1 more unit has been booked and the reported concrete structure (RCC) has gone from 70% to 50%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.