Weone 121, Wakad
by GRD Infraprojects Private Limited. Wakad, Pune 411057. View on Google Maps
- Launched
- 2 years 3 months originally promised
- Possession date (MahaRERA)
- 2 months awayExtended by 1 year 7 months (originally May 2025). Why possession dates change
- Concrete structure (RCC)
- 95%Mid-construction
- Units booked
- 15 of 4931% booked
Project facts
| 1 RK | 1 |
|---|---|
| Other units (shops, offices or not given by type) | 48 |
| Total units | 49 |
| Buildings | 1 |
| Land | 0.3 acres |
| Landowner share | 16 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 24 → 15 · structure 65% → 95% · final finishes 0% → 10% · possession date May 2025 → December 2026 · total units 33 → 49
Construction progress
As reported to MahaRERA at each updateIf a percentage drops between updates, we show it as MahaRERA reported it.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 95% | 10% | 15 | |
| 100% | 65% | 0% | 24 | |
| 100% | 75% | 0% | 23 | |
| 100% | 65% | 0% | 14 | |
| 100% | 0% | 0% | 11 |
"—" means MahaRERA shows no figure for that update.
Other phases of this project
About this project
Weone 121 (MahaRERA P52100049391) is a residential project by GRD Infraprojects Private Limited in Wakad, Pune 411057. It was launched in February 2023. It has 49 units in 1 building: 1 home (1 RK) and 48 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, extended by 1 year 7 months from the original May 2025. Construction: excavation complete, structure (RCC) 95% complete, final finishes 10% complete. MahaRERA records do not show it as ready to move in.
15 of its 49 units are booked (31%). Since the December 2025 update, the reported concrete structure (RCC) has gone from 65% to 95% and the possession date has moved from May 2025 to December 2026.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.