Brain Matrix, Aundh
by M/s Bora Associates. Aundh, Pune 411007. View on Google Maps
- Launched
- 2 years 9 months originally promised
- Possession date (MahaRERA)
- 2 months awayExtended by 1 year (originally December 2025). Why possession dates change
- Concrete structure (RCC)
- 10%Mid-constructionAverage across 2 buildings
- Units booked
- 2 of 825% booked
Project facts
| 1 BHK | 7 |
|---|---|
| Other units (shops, offices or not given by type) | 1 |
| Total units | 8 |
| Buildings | 2 |
| Land | 0.3 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Construction progress
As reported to MahaRERA at each updateIf a percentage drops between updates, we show it as MahaRERA reported it.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 50% | 10% | 0% | 2 | |
| 100% | 20% | 0% | 2 | |
| 100% | 20% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Brain Matrix (MahaRERA P52100050187) is a residential project by M/s Bora Associates in Aundh, Pune 411007. It was launched in March 2023. It has 8 units in 2 buildings: 7 homes (1 BHK) and 1 other unit (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, extended by 1 year from the original December 2025. Construction, averaged across its 2 buildings: excavation 50% complete, structure (RCC) 10% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
2 of its 8 units are booked (25%).
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.