Zenone B Building, Wakad
by K & T Infrastructure. Wakad, Pune 411057. View on Google Maps
- Launched
- 3 years 11 months promised
- Possession date (MahaRERA)
- 11 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 65%Mid-construction
- Units booked
- 4 of 944% booked
Project facts
| 2 BHK | 36 |
|---|---|
| 3 BHK | 58 |
| Total units | 94 |
| Buildings | 1 |
| Land | 2.4 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Compared with 6 similar projects in PIN 411057
Projects with 40–200 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 3 yrs 11 mths | 3 yrs 3 mths |
| Possession date extended | No | 0 of 6 |
| Possession date (MahaRERA) | September 2027 | December 2026 |
| Concrete structure (RCC) complete | 65% | 100% |
| Share of units booked | 4% | 58% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Siddhi Nisarg C Building | October 2023 | December 2026 | 100% | 92 of 95 booked (97%) |
| Param | October 2023 | December 2027 | 85% | 107 of 175 booked (61%) |
| Sky World | September 2023 | October 2026 | 100% | 45 of 115 booked (39%) |
| Trinity Grace | September 2023 | December 2025 | 100% | 43 of 50 booked (86%) |
| Palm Springs Ph-II D-wing | November 2023 | December 2027 | 43% | 94 of 172 booked (55%) |
| Shiv Malhar | August 2023 | December 2026 | 100% | 44 of 122 booked (36%) |
Construction progress
As reported to MahaRERA at each updateIf a percentage drops between updates, we show it as MahaRERA reported it.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 65% | 10% | 4 | |
| 100% | 90% | 10% | 4 | |
| 0% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Zenone B Building (MahaRERA P52100053350) is a residential project by K & T Infrastructure in Wakad, Pune 411057. It was launched in October 2023. It has 94 units in 1 building, with 2 & 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is September 2027, unchanged since launch. Construction: excavation complete, structure (RCC) 65% complete, final finishes 10% complete. MahaRERA records do not show it as ready to move in.
4 of its 94 units are booked (4%).
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.