18 Altitude, Chinchwad
by Gdsquare Infra LLP. Chinchwad, Pune 411033. View on Google Maps
- Launched
- 5 years 6 months promised
- Possession date (MahaRERA)
- 3 years 2 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 5%Mid-constructionAverage across 3 buildings
- Units booked
- 6 of 2512% booked
Project facts
| 2 BHK | 70 |
|---|---|
| 3 BHK | 17 |
| Other units (shops, offices or not given by type) | 164 |
| Total units | 251 |
| Buildings | 3 |
| Land | 3.5 acres |
| Landowner share | 66 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: total units 181 → 251
Compared with 6 similar projects in PIN 411033
Projects with 40–200 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 5 yrs 6 mths | 3 yrs 6 mths |
| Possession date extended | No | 1 of 6 |
| Possession date (MahaRERA) | December 2029 | December 2027 |
| Concrete structure (RCC) complete | 5% | 66% |
| Share of units booked | 2% | 66% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Saishilp Empire | June 2024 | December 2027 | 100% | 31 of 56 booked (55%) |
| Aeternaa - C Wing Phase 1 | July 2024 | December 2028 | 0% | 52 of 76 booked (68%) |
| Glory | July 2024 | June 2027 | 47% | 47 of 72 booked (65%) |
| The 4th Axis Phase 2 | May 2024 | December 2027 | 100% | 74 of 110 booked (67%) |
| Basil Maximus Wing F | May 2024 | December 2028 | 15% | 105 of 152 booked (69%) |
| Visoka Keystone- A Building | August 2024 | June 2026 | 85% | 50 of 112 booked (45%) |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 50% | 5% | 0% | 6 | |
| 51% | 5% | 0% | 6 | |
| 0% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
18 Altitude (MahaRERA P52100076759) is a residential project by Gdsquare Infra LLP in Chinchwad, Pune 411033. It was launched in June 2024. It has 251 units in 3 buildings: 87 homes (2 & 3 BHK) and 164 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2029, unchanged since launch. Construction, averaged across its 3 buildings: excavation 50% complete, structure (RCC) 5% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
6 of its 251 units are booked (2%).
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.