Integrated Arya, Ghatkopar West

by Integrated Spaces Limited · Ghatkopar West, Mumbai 400086 · Map

Launched
Aug 20171 yr 7 mths originally promised
Possession (MahaRERA)
Mar 2022Extended by 3 yrs
Concrete structure
88%Mid-construction
Booked (free sale)
82 of 10280% · 65 rehab units
Buildings
10.8 acres
MahaRERA complaints
1Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Units booked

Free sale82 booked out of 102 units

Rehab65 units for existing members

Total 167 units. Rehab units are not for sale.

Project facts

1 RK
3
1 BHK
125
2 BHK
31
Other units
8
Total units
167
Buildings
1
Land
0.8 acres
Phases
1
MahaRERA complaints
1
Free-sale units
102
Rehab units
65

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)88%
Finishes, lifts and services92%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 88%Dec 2025: Concrete structure (RCC) 88%Jul 2026: Concrete structure (RCC) 88%Dec 2024: Final finishes 92%Dec 2025: Final finishes 92%Jul 2026: Final finishes 92%Excavation 100%Final finishes 92%Concrete structure (RCC) 88%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%88%92%82
100%88%92%82
100%88%92%53

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400086

Projects with 70–350 flats, launched within 6 months of this one.

Compared with 6 similar projects in PIN 400086
MeasureThis projectSimilar projects
Launch to possession (as first promised)1 yr 7 mths3 yrs 10 mths
Possession date extendedBy 3 yrs5 of 6
Possession date (MahaRERA)Mar 2022Sep 2025
Concrete structure (RCC)88%89%
Units booked (free sale)80%54%
MahaRERA complaints (filed by or against the builder)12

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Integrated Arya by Integrated Spaces Limited is a 167-unit BMC-sanctioned project in Ghatkopar West, Mumbai 400086, launched in August 2017 with possession due in March 2022. 82 units booked out of 102 units for sale. The concrete structure (RCC) is 88% complete.

Read full summary

Integrated Arya is a BMC-sanctioned project by Integrated Spaces Limited in Ghatkopar West, Mumbai 400086, registered with MahaRERA as P51800004521. It was launched in August 2017. It has 167 units in 1 building: 159 homes (1 RK, 1 BHK and 2 BHK) and 8 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active. Of the 167 units, 102 are for sale and 65 are rehab units for existing members.

Possession was due in March 2022, after an extension of 3 years from the original March 2019. That date has passed and no further extension has been recorded. Construction: excavation complete, structure (RCC) 88% complete, final finishes 92% complete.

82 units booked out of 102 units for sale (80%).