Puneet Brahmand, Vikhroli

by Puneet Edifice Pvt Ltd · Vikhroli, Mumbai 400083 · Map

Launched
Sep 20224 yrs 3 mths promised
Possession (MahaRERA)
Dec 2026Not extended
Concrete structure
54%Mid-construction
Booked
106 of 106100%
Buildings
10.2 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
56
2 BHK
49
3 BHK
1
Total units
106
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)54%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 54%Dec 2025: Concrete structure (RCC) 54%Jul 2026: Concrete structure (RCC) 54%Oct 2026: Concrete structure (RCC) 54%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 54%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%54%0%106
100%54%0%–
100%54%0%–
100%54%0%40

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 4 similar projects in PIN 400083

Projects with 50–250 flats, launched within 6 months of this one.

Compared with 4 similar projects in PIN 400083
MeasureThis projectSimilar projects
Launch to possession (as first promised)4 yrs 3 mths3 yrs 8 mths
Possession date extendedNo2 of 4
Possession date (MahaRERA)Dec 2026Jan 2027
Concrete structure (RCC)54%100%
Units booked100%90%
MahaRERA complaints (filed by or against the builder)00

The 4 projects

Other phases of this project are not included in the similar projects.

About this project

Puneet Brahmand by Puneet Edifice Pvt Ltd is a 106-unit MHADA-sanctioned project in Vikhroli, Mumbai 400083, launched in September 2022 with possession due in December 2026. 106 units booked out of total 106 units. The concrete structure (RCC) is 54% complete.

Read full summary

Puneet Brahmand is a MHADA-sanctioned project by Puneet Edifice Pvt Ltd in Vikhroli, Mumbai 400083, registered with MahaRERA as P51800046881. It was launched in September 2022. It has 106 units in 1 building, with 1, 2 and 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2026, unchanged since launch. Construction: excavation complete, structure (RCC) 54% complete, final finishes not started.

106 units booked out of total 106 units (100%).