Lapsed

by Laxmi Lifespaces India Pvt Ltd · Dahisar, Mumbai 400068 · Map

Launched
Sep 20223 yrs 4 mths promised
Possession (MahaRERA)
Jan 2026Not extendedWhat does Lapsed mean?
Concrete structure
100%Nearing possession
Booked
–
Buildings
10.5 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
28
2 BHK
20
3 BHK
10
Other units
2
Total units
60
Buildings
1
Land
0.5 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)100%
Finishes, lifts and services75%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 100%Dec 2025: Concrete structure (RCC) 100%Jul 2026: Concrete structure (RCC) 100%Dec 2024: Final finishes 35%Dec 2025: Final finishes 75%Jul 2026: Final finishes 75%Excavation 100%Concrete structure (RCC) 100%Final finishes 75%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%75%–
100%100%75%–
100%100%35%26

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 5 similar projects in PIN 400068

Projects with 20–150 flats, launched within 6 months of this one.

Compared with 5 similar projects in PIN 400068
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs 4 mths3 yrs 6 mths
Possession date extendedNo1 of 5
Possession date (MahaRERA)Jan 2026Jun 2026
Concrete structure (RCC)100%100%
Units booked–74%
MahaRERA complaints (filed by or against the builder)00

The 5 projects

Other phases of this project are not included in the similar projects.

About this project

Vishwa Vihang Heights by Laxmi Lifespaces India Pvt Ltd is a 60-unit BMC-sanctioned project in Dahisar, Mumbai 400068, launched in September 2022; its MahaRERA registration has lapsed. The concrete structure (RCC) is complete.

Read full summary

Vishwa Vihang Heights is a BMC-sanctioned project by Laxmi Lifespaces India Pvt Ltd in Dahisar, Mumbai 400068, registered with MahaRERA as P51800047022. It was launched in September 2022. It has 60 units in 1 building: 58 homes (1, 2 and 3 BHK) and 2 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in January 2026. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) complete, final finishes 75% complete.