Vaishno Neelkanth Apartment, Malad East

Lapsed

by Shree Vaishno Homes Pvt ltd · Malad East, Mumbai 400097 · Map

Launched
May 20231 yr 7 mths originally promised
Possession (MahaRERA)
Jun 2025Extended by 6 mthsWhat does Lapsed mean?
Concrete structure
100%Nearing possession
Booked
–
Buildings
10.2 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
17
2 BHK
5
3 BHK
8
Other units
5
Total units
35
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)100%
Finishes, lifts and services60%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 100%Dec 2025: Concrete structure (RCC) 100%Jul 2026: Concrete structure (RCC) 100%Dec 2024: Final finishes 60%Dec 2025: Final finishes 60%Jul 2026: Final finishes 60%Excavation 100%Concrete structure (RCC) 100%Final finishes 60%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%60%–
100%100%60%–
100%100%60%20

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400097

Projects with 10–60 flats, launched within 6 months of this one.

Compared with 6 similar projects in PIN 400097
MeasureThis projectSimilar projects
Launch to possession (as first promised)1 yr 7 mths2 yrs 3 mths
Possession date extendedBy 6 mths5 of 6
Possession date (MahaRERA)Jun 2025Nov 2026
Concrete structure (RCC)100%100%
Units booked–81%
MahaRERA complaints (filed by or against the builder)00

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Vaishno Neelkanth Apartment by Shree Vaishno Homes Pvt ltd is a 35-unit BMC-sanctioned project in Malad East, Mumbai 400097, launched in May 2023; its MahaRERA registration has lapsed. The concrete structure (RCC) is complete.

Read full summary

Vaishno Neelkanth Apartment is a BMC-sanctioned project by Shree Vaishno Homes Pvt ltd in Malad East, Mumbai 400097, registered with MahaRERA as P51800051076. It was launched in May 2023. It has 35 units in 1 building: 30 homes (1, 2 and 3 BHK) and 5 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in June 2025, after an extension of 6 months from the original December 2024. That date has passed and no further extension has been recorded. Construction: excavation complete, structure (RCC) complete, final finishes 60% complete.