Kush Avenuee, Ghatkopar East

Lapsed

by Nutan Sandesh Chsl · Ghatkopar East, Mumbai 400077 · Map

Launched
Oct 20232 yrs 6 mths promised
Possession (MahaRERA)
Apr 2026Not extendedWhat does Lapsed mean?
Concrete structure
85%Mid-construction
Booked
49 of 5884%
Buildings
10.4 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

2 BHK
12
3 BHK
6
Other units
40
Total units
58
Buildings
1
Land
0.4 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)85%
Finishes, lifts and services10%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 60%Dec 2025: Concrete structure (RCC) 60%Jul 2026: Concrete structure (RCC) 85%Oct 2026: Concrete structure (RCC) 85%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 10%Oct 2026: Final finishes 10%Excavation 100%Concrete structure (RCC) 85%Final finishes 10%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%85%10%49
100%85%10%49
100%60%0%49
100%60%0%39

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400077

Projects with up to 40 flats, launched within 6 months of this one.

Compared with 6 similar projects in PIN 400077
MeasureThis projectSimilar projects
Launch to possession (as first promised)2 yrs 6 mths4 yrs 1 mth
Possession date extendedNo1 of 6
Possession date (MahaRERA)Apr 2026Dec 2027
Concrete structure (RCC)85%98%
Units booked84%71%
MahaRERA complaints (filed by or against the builder)00

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Kush Avenuee by Nutan Sandesh Chsl is a 58-unit BMC-sanctioned project in Ghatkopar East, Mumbai 400077, launched in October 2023; its MahaRERA registration has lapsed. 49 units booked out of total 58 units. The concrete structure (RCC) is 85% complete.

Read full summary

Kush Avenuee is a BMC-sanctioned project by Nutan Sandesh Chsl in Ghatkopar East, Mumbai 400077, registered with MahaRERA as P51800052873. It was launched in October 2023. It has 58 units in 1 building: 18 homes (2 and 3 BHK) and 40 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in April 2026. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 85% complete, final finishes 10% complete.

49 units booked out of total 58 units (84%).