Signature Residences By C.K.V, Mulund East

by Neelam Dream Lands LLP · Mulund East, Mumbai 400081 · Map

Launched
Sep 20256 yrs 3 mths promised
Possession (MahaRERA)
Dec 2031Not extended
Concrete structure
5%Mid-construction
Booked
30 of 8237% · 20 in Jul 2026
Buildings
11.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

2 BHK
36
3 BHK
30
Other units
16
Total units
82
Buildings
1
Land
1.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation1%
Concrete structure (slabs)5%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2025Jul 2026Oct 2026Dec 2025: Excavation 1%Jul 2026: Excavation 1%Oct 2026: Excavation 1%Dec 2025: Concrete structure (RCC) 0%Jul 2026: Concrete structure (RCC) 0%Oct 2026: Concrete structure (RCC) 5%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Concrete structure (RCC) 5%Excavation 1%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
1%5%0%30
1%0%0%20
1%0%0%0

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400081

Projects with 30–150 flats, launched within 6 months of this one.

Compared with 6 similar projects in PIN 400081
MeasureThis projectSimilar projects
Launch to possession (as first promised)6 yrs 3 mths3 yrs 4 mths
Possession date extendedNo0 of 6
Possession date (MahaRERA)Dec 2031Oct 2028
Concrete structure (RCC)5%54%
Units booked37%35%
MahaRERA complaints (filed by or against the builder)00

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Signature Residences By C.K.V by Neelam Dream Lands LLP is an 82-unit BMC-sanctioned project in Mulund East, Mumbai 400081, launched in September 2025 with possession due in December 2031. 30 units booked out of total 82 units. The concrete structure (RCC) is 5% complete.

Read full summary

Signature Residences By C.K.V is a BMC-sanctioned project by Neelam Dream Lands LLP in Mulund East, Mumbai 400081, registered with MahaRERA as PM1180002500841. It was launched in September 2025. It has 82 units in 1 building: 66 homes (2 and 3 BHK) and 16 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2031, unchanged since launch. Construction: excavation 1% complete, structure (RCC) 5% complete, final finishes not started.

30 units booked out of total 82 units (37%). Since the July 2026 update, 10 more units have been booked and the reported concrete structure (RCC) has gone from 0% to 5%.