EL Regalo, Mohammadwadi
by Mahesh Realtors. Mohammadwadi, Pune 411060. View on Google Maps
- Launched
- 5 years 10 months originally promised
- Possession date (MahaRERA)
- 2 months awayExtended by 3 years (originally December 2023). Why possession dates change
- Concrete structure (RCC)
- 67%Mid-constructionAverage across 3 buildings
- Units booked
- 93 of 16357% booked
Project facts
| 2 BHK | 94 |
|---|---|
| Other units (shops, offices or not given by type) | 69 |
| Total units | 163 |
| Buildings | 3 |
| Land | 1.5 acres |
| Complaints on MahaRERA (filed by or against the builder) | 2 |
Since Dec 2025: complaints 0 → 2
Compared with 5 similar projects in PIN 411060
Projects with 40–200 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 5 yrs 10 mths | 6 yrs 4 mths |
| Possession date extended | By 3 years | 4 of 5 |
| Possession date (MahaRERA) | December 2026 | June 2029 |
| Concrete structure (RCC) complete | 67% | 60% |
| Share of units booked | 57% | 63% |
| Complaints on MahaRERA (filed by or against the builder) | 2 | 10 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Dynamic Grandeur Premium I | March 2018 | December 2031 | 60% | 79 of 126 booked (63%) |
| Platinum Park Phase II | August 2017 | December 2026 | 10% | 9 of 88 booked (10%) |
| Riva | August 2017 | May 2026 | 100% | 68 of 104 booked (65%) |
| Callisto | August 2017 | December 2024 | 50% | 35 of 112 booked (31%) |
| Engracia B C E F | August 2017 | December 2024 | 100% | All 140 units booked |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 67% | 57% | 93 |
"—" means MahaRERA shows no figure for that update.
About this project
EL Regalo (MahaRERA P52100015370) is a residential project by Mahesh Realtors in Mohammadwadi, Pune 411060. It was launched in February 2018. It has 163 units in 3 buildings: 94 homes (2 BHK) and 69 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, extended by 3 years from the original December 2023. Construction, averaged across its 3 buildings: excavation complete, structure (RCC) 67% complete, final finishes 57% complete. MahaRERA records do not show it as ready to move in.
93 of its 163 units are booked (57%).
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.