Skip to main content
← Back

Lodha Pune NIBM Project- Tower 7,8 and 9, Mohammadwadi

Also known as Lodha Bella Vita

by Lodha Developers Limited. Mohammadwadi, Pune 411060. View on Google Maps

Launched
5 years 6 months promised
Possession date (MahaRERA)
1 year 2 months awayPossession date unchanged since launch
Concrete structure (RCC)
85%Mid-constructionAverage across 3 buildings
Units booked
284 of 31490% booked

Project facts

2 BHK113
3 BHK112
4 BHK89
Total units314
Buildings3
Land3.5 acres
Complaints on MahaRERA (filed by or against the builder)2

Since Dec 2025: booked 244 → 284 · structure 60% → 85% · complaints 0 → 2

Share on WhatsApp

Compared with 6 similar projects in PIN 411060

Projects with 150–700 flats, launched within 1 year of this one.

Compared with 6 similar projects in PIN 411060
MeasureThis projectSimilar projects
Promised timeline (launch to possession)5 yrs 6 mths4 yrs 10 mths
Possession date extendedNo1 of 6
Possession date (MahaRERA)December 2027December 2026
Concrete structure (RCC) complete85%100%
Share of units booked90%80%
Complaints on MahaRERA (filed by or against the builder)20

"Similar projects" shows the typical (middle) value. Other phases of this project are not included.

Construction progress

As reported to MahaRERA at each update
Time used and structure built
4 years 4 months of the promised 5 years 6 months have passed
Concrete structure (RCC) 85% complete
Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2023Jun 2024Dec 2024Jun 2025Dec 2025Jul 2026Dec 2023: Excavation 0%Jun 2024: Excavation 67%Dec 2024: Excavation 67%Jun 2025: Excavation 67%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2023: Concrete structure (RCC) 0%Jun 2024: Concrete structure (RCC) 0%Dec 2024: Concrete structure (RCC) 0%Jun 2025: Concrete structure (RCC) 0%Dec 2025: Concrete structure (RCC) 60%Jul 2026: Concrete structure (RCC) 85%Dec 2023: Final finishes 0%Jun 2024: Final finishes 0%Dec 2024: Final finishes 0%Jun 2025: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 85%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%85%0%284
100%60%0%244
67%0%0%119
0%0%0%35

"—" means MahaRERA shows no figure for that update.

Other phases of this project

About this project

Lodha Pune NIBM Project- Tower 7,8 and 9 (MahaRERA P52100046081) is a residential project by Lodha Developers Limited in Mohammadwadi, Pune 411060. It is also known as Lodha Bella Vita. It was launched in June 2022. It has 314 units in 3 buildings, with 2, 3 & 4 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is December 2027, unchanged since launch. Construction, averaged across its 3 buildings: excavation complete, structure (RCC) 85% complete, final finishes not started. MahaRERA records do not show it as ready to move in.

284 of its 314 units are booked (90%). Since the December 2025 update, 40 more units have been booked and the reported concrete structure (RCC) has gone from 60% to 85%.

Lodha's track record in Pune

MahaRERA projects registered 2017–2026, in the 59 areas FlatNama covers

Projects registered with MahaRERA56
Completed without extending the possession date15
Completed after an extension, or lapsed0
Under construction41
Possession date extended by the builder5
Typical time from launch to 100% structure3 years 7 months
Complaints on MahaRERA, all Lodha projects36 (17 of 56 projects)

See all Lodha projects →

Disclaimers
  • Figures are as reported to MahaRERA, not verified by FlatNama.
  • Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
  • On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
  • Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
  • Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
  • Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
  • Rates also vary with the exact project location.
  • Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
  • Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
  • Please do your own checks before you buy.
Source: MahaRERA registration P52100046081.Check it on MahaRERA (P52100046081)All projects in Mohammadwadi, Undri