Signature Ritz, Thergaon
by Shree Sonigara Realcon. Thergaon, Pune 411033. View on Google Maps
- Launched
- 5 years 5 months promised
- Possession date (MahaRERA)
- 2 years 2 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 27%Mid-constructionAverage across 2 buildings
- Units booked
- 121 of 28842% booked
Project facts
| 3 BHK | 133 |
|---|---|
| 4 BHK | 57 |
| Other units (shops, offices or not given by type) | 98 |
| Total units | 288 |
| Buildings | 2 |
| Land | 8.2 acres |
| Complaints on MahaRERA (filed by or against the builder) | 1 |
Since Dec 2025: booked 106 → 121 · structure 26% → 27%
Compared with 6 similar projects in PIN 411033
Projects with 90–400 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 5 yrs 5 mths | 4 yrs 6 mths |
| Possession date extended | No | 0 of 6 |
| Possession date (MahaRERA) | December 2028 | December 2027 |
| Concrete structure (RCC) complete | 27% | 100% |
| Share of units booked | 42% | 86% |
| Complaints on MahaRERA (filed by or against the builder) | 1 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Harivishva Infinia Phase 2 | August 2023 | December 2027 | 100% | 202 of 205 booked (99%) |
| Metro Life Ultima Residences Phase I | June 2023 | December 2027 | 60% | 155 of 194 booked (80%) |
| Metro Life Ultima Residences Phase II | August 2023 | June 2028 | 0% | 56 of 182 booked (31%) |
| Petals | June 2023 | April 2030 | 100% | 72 of 147 booked (49%) |
| Basil Maximus Wing D and E | June 2023 | December 2027 | 100% | 294 of 305 booked (96%) |
| Visoka Keystone- B Building | August 2023 | December 2025 | 100% | 130 of 140 booked (93%) |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 75% | 27% | 0% | 121 | |
| 70% | 26% | 0% | 106 | |
| 70% | 0% | 0% | 72 | |
| 88% | 0% | 0% | 104 |
"—" means MahaRERA shows no figure for that update.
About this project
Signature Ritz (MahaRERA P52100052042) is a residential project by Shree Sonigara Realcon in Thergaon, Pune 411033. It was launched in July 2023. It has 288 units in 2 buildings: 190 homes (3 & 4 BHK) and 98 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2028, unchanged since launch. Construction, averaged across its 2 buildings: excavation 75% complete, structure (RCC) 27% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
121 of its 288 units are booked (42%). Since the December 2025 update, 15 more units have been booked and the reported concrete structure (RCC) has gone from 26% to 27%.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.