Petals, Tathawade
by Pashankar Developers. Tathawade, Pune 411033. View on Google Maps
- Launched
- 6 years 10 months promised
- Possession date (MahaRERA)
- 3 years 6 months awayPossession date unchanged since launch
- Concrete structure (RCC)
- 100%Nearing possessionAverage across 6 buildings
- Units booked
- 72 of 14749% booked
- Price per sq ft (incl. balconies and terrace)
- ₹7,5002026 so far · 10 sales80% of the 2026 sales we found were at this rate or lessSee what buyers paid
Project facts
| 1 BHK | 56 |
|---|---|
| 2 BHK | 70 |
| 3 BHK | 21 |
| Total units | 147 |
| Buildings | 6 |
| Land | 0.8 acres |
| Landowner share | 37 |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 45 → 72 · structure 25% → 100% · final finishes 0% → 8%
What buyers paid here
From government sale recordsThe price per sq ft is the agreed price of the flat alone, counting balconies and terrace.
Price per sq ft, year by year
80% of the flats sold in each year went for this price or less.
| 2026 so far | ₹7,500 per sq ft | 10 sales |
|---|
Rate vs other Tathawade projects, 2026: about 25% lower
Compared with 6 similar projects in PIN 411033
Projects with 70–300 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 6 yrs 10 mths | 4 yrs 6 mths |
| Possession date extended | No | 1 of 6 |
| Possession date (MahaRERA) | April 2030 | June 2028 |
| Concrete structure (RCC) complete | 100% | 72% |
| Share of units booked | 49% | 86% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Metro Life Ultima Residences Phase I | June 2023 | December 2027 | 60% | 155 of 194 booked (80%) |
| Trio Alpha | June 2023 | June 2026 | 83% | 87 of 116 booked (75%) |
| Basil Maximus Wing D and E | June 2023 | December 2027 | 100% | 294 of 305 booked (96%) |
| Puneville Phase III Cluster C | May 2023 | December 2029 | 14% | 95 of 104 booked (91%) |
| Signature Ritz | July 2023 | December 2028 | 27% | 121 of 288 booked (42%) |
| Visoka Keystone- B Building | August 2023 | December 2025 | 100% | 130 of 140 booked (93%) |
Construction progress
As reported to MahaRERA at each updateIf a percentage drops between updates, we show it as MahaRERA reported it.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 100% | 8% | 72 | |
| 67% | 25% | 0% | 45 | |
| 75% | 38% | 0% | 45 | |
| 50% | 25% | 0% | 31 | |
| 0% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Petals (MahaRERA P52100051579) is a residential project by Pashankar Developers in Tathawade, Pune 411033. It was launched in June 2023. It has 147 units in 6 buildings, with 1, 2 & 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is April 2030, unchanged since launch. Construction, averaged across its 6 buildings: excavation complete, structure (RCC) complete, final finishes 8% complete. MahaRERA records do not show it as ready to move in.
72 of its 147 units are booked (49%). Since the December 2025 update, 27 more units have been booked and the reported concrete structure (RCC) has gone from 25% to 100%. 80% of the 2026 (so far) sales we found here were at ₹7,500 per sq ft or less, counting balconies and terrace in the size, based on 10 registered sales. Buyers here paid a rate about 25% lower than at other Tathawade projects in 2026.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.