Sheetal Heights, Malad East

Lapsed

by Toughcons Realtors Private Limited · Malad East, Mumbai 400097 · Map

Launched
Aug 20172 yrs 4 mths originally promised
Possession (MahaRERA)
Dec 2021Extended by 2 yrsWhat does Lapsed mean?
Concrete structure
10%Mid-construction
Booked
35 of 3795%
Buildings
10.5 acres
MahaRERA complaints
8Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 RK
2
1 BHK
6
2 BHK
28
3 BHK
1
Total units
37
Buildings
1
Land
0.5 acres
Phases
1
MahaRERA complaints
8

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)10%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 10%Dec 2025: Concrete structure (RCC) 10%Jul 2026: Concrete structure (RCC) 10%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 10%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%10%0%35
100%10%0%35
100%10%0%35

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400097

Projects with 10–80 flats, launched within 6 months of this one.

Compared with 6 similar projects in PIN 400097
MeasureThis projectSimilar projects
Launch to possession (as first promised)2 yrs 4 mths4 yrs 10 mths
Possession date extendedBy 2 yrs6 of 6
Possession date (MahaRERA)Dec 2021Mar 2026
Concrete structure (RCC)10%80%
Units booked95%79%
MahaRERA complaints (filed by or against the builder)80

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Sheetal Heights by Toughcons Realtors Private Limited is a 37-unit BMC-sanctioned project in Malad East, Mumbai 400097, launched in August 2017; its MahaRERA registration has lapsed. 35 units booked out of total 37 units. The concrete structure (RCC) is 10% complete.

Read full summary

Sheetal Heights is a BMC-sanctioned project by Toughcons Realtors Private Limited in Malad East, Mumbai 400097, registered with MahaRERA as P51800002698. It was launched in August 2017. It has 37 units in 1 building, with 1 RK, 1 BHK, 2 BHK and 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2021, after an extension of 2 years from the original December 2019. That date has passed and no further extension has been recorded. Construction: excavation complete, structure (RCC) 10% complete, final finishes not started.

35 units booked out of total 37 units (95%).