Ashoka Co-Op Hsg Society Limited, Dahisar

Lapsed

by M/S Design Builders Pvt Ltd · Dahisar, Mumbai 400068 · Map

Launched
Aug 20171 yr 7 mths originally promised
Possession (MahaRERA)
Jul 2026Extended by 7 yrs 4 mthsWhat does Lapsed mean?
Concrete structure
35%Mid-construction
Booked (free sale)
12 of 3238% · 15 rehab units
Buildings
10.2 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Units booked

Free sale12 booked out of 32 units

Rehab15 units for existing members

Total 47 units. Rehab units are not for sale.

Project facts

1 BHK
20
2 BHK
20
Other units
7
Total units
47
Buildings
1
Land
0.2 acres
Phases
1
MahaRERA complaints
0
Free-sale units
32
Rehab units
15

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation95%
Concrete structure (slabs)35%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 95%Dec 2025: Excavation 95%Jul 2026: Excavation 95%Oct 2026: Excavation 95%Dec 2024: Concrete structure (RCC) 35%Dec 2025: Concrete structure (RCC) 35%Jul 2026: Concrete structure (RCC) 35%Oct 2026: Concrete structure (RCC) 35%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 95%Concrete structure (RCC) 35%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
95%35%0%12
95%35%0%12
95%35%0%12
95%35%0%9

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 5 similar projects in PIN 400068

Projects with 20–80 flats, launched within 6 months of this one.

Compared with 5 similar projects in PIN 400068
MeasureThis projectSimilar projects
Launch to possession (as first promised)1 yr 7 mths2 yrs 5 mths
Possession date extendedBy 7 yrs 4 mths5 of 5
Possession date (MahaRERA)Jul 2026Mar 2024
Concrete structure (RCC)35%70%
Units booked (free sale)38%62%
MahaRERA complaints (filed by or against the builder)00

The 5 projects

Other phases of this project are not included in the similar projects.

About this project

Ashoka Co-Op Hsg Society Limited by M/S Design Builders Pvt Ltd is a 47-unit BMC-sanctioned project in Dahisar, Mumbai 400068, launched in August 2017; its MahaRERA registration has lapsed. 12 units booked out of 32 units for sale. The concrete structure (RCC) is 35% complete.

Read full summary

Ashoka Co-Op Hsg Society Limited is a BMC-sanctioned project by M/S Design Builders Pvt Ltd in Dahisar, Mumbai 400068, registered with MahaRERA as P51800008451. It was launched in August 2017. It has 47 units in 1 building: 40 homes (1 and 2 BHK) and 7 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Lapsed. Of the 47 units, 32 are for sale and 15 are rehab units for existing members.

Possession was due in July 2026, after an extension of 7 years 4 months from the original March 2019. That date has passed and no further extension has been recorded. Construction: excavation 95% complete, structure (RCC) 35% complete, final finishes not started.

12 units booked out of 32 units for sale (38%).