Avis Vraj A Paradise, Ghatkopar West

Lapsed

by Avi Housing · Ghatkopar West, Mumbai 400086 · Map

Launched
Sep 20172 yrs 3 mths originally promised
Possession (MahaRERA)
Dec 2020Extended by 1 yrWhat does Lapsed mean?
Concrete structure
100%Nearing possession
Booked
–
Buildings
10.4 acres
MahaRERA complaints
2Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 BHK
30
2 BHK
15
Total units
45
Buildings
1
Land
0.4 acres
Phases
1
MahaRERA complaints
2

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)100%
Finishes, lifts and services80%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 100%Dec 2025: Concrete structure (RCC) 100%Jul 2026: Concrete structure (RCC) 100%Dec 2024: Final finishes 80%Dec 2025: Final finishes 80%Jul 2026: Final finishes 80%Excavation 100%Concrete structure (RCC) 100%Final finishes 80%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%100%80%–
100%100%80%–
100%100%80%45

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 3 similar projects in PIN 400086

Projects with 20–90 flats, launched within 6 months of this one.

Compared with 3 similar projects in PIN 400086
MeasureThis projectSimilar projects
Launch to possession (as first promised)2 yrs 3 mths3 yrs 4 mths
Possession date extendedBy 1 yr3 of 3
Possession date (MahaRERA)Dec 2020Jun 2025
Concrete structure (RCC)100%100%
MahaRERA complaints (filed by or against the builder)20

The 3 projects

Other phases of this project are not included in the similar projects.

About this project

Avis Vraj A Paradise by Avi Housing is a 45-unit project in Ghatkopar West, Mumbai 400086, launched in September 2017; its MahaRERA registration has lapsed. The concrete structure (RCC) is complete.

Read full summary

Avis Vraj A Paradise is a project by Avi Housing in Ghatkopar West, Mumbai 400086, registered with MahaRERA as P51800012724. It was launched in September 2017. It has 45 units in 1 building, with 1 and 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2020, after an extension of 1 year from the original December 2019. That date has passed and no further extension has been recorded. Construction: excavation complete, structure (RCC) complete, final finishes 80% complete.