Skip to main content

Vipin Residency, Dadar West

Lapsed

by Anmol Land Developers · Dadar West, Mumbai 400028 · Map

Launched
Aug 20175 yrs 4 mths originally promised
Possession (MahaRERA)
Dec 2023Extended by 1 yrWhat does Lapsed mean?
Concrete structure
90%Mid-construction
Booked
18 of 2962%
Buildings
10.3 acres
MahaRERA complaints
2Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 RK
3
2 BHK
8
3 BHK
18
Total units
29
Buildings
1
Land
0.3 acres
Phases
1
MahaRERA complaints
2

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)90%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 90%Dec 2025: Concrete structure (RCC) 90%Jul 2026: Concrete structure (RCC) 90%Oct 2026: Concrete structure (RCC) 90%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 90%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%90%0%18
100%90%0%–
100%90%0%–
100%90%0%18

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 6 similar projects in PIN 400028

Projects with 10–60 flats, launched within 6 months of this one.

Compared with 6 similar projects in PIN 400028
MeasureThis projectSimilar projects
Launch to possession (as first promised)5 yrs 4 mths4 yrs
Possession date extendedBy 1 yr5 of 6
Possession date (MahaRERA)Dec 2023Mar 2024
Concrete structure (RCC)90%92%
Units booked62%46%
MahaRERA complaints (filed by or against the builder)20

The 6 projects

Other phases of this project are not included in the similar projects.

About this project

Vipin Residency by Anmol Land Developers is a 29-unit project in Dadar West, Mumbai 400028, launched in August 2017; its MahaRERA registration has lapsed. 18 units booked out of total 29 units. The concrete structure (RCC) is 90% complete.

Read full summary

Vipin Residency is a project by Anmol Land Developers in Dadar West, Mumbai 400028, registered with MahaRERA as P51900006333. It was launched in August 2017. It has 29 units in 1 building, with 1 RK, 2 BHK and 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2023, after an extension of 1 year from the original December 2022. That date has passed and no further extension has been recorded. Construction: excavation complete, structure (RCC) 90% complete, final finishes not started.

18 units booked out of total 29 units (62%).