LS Laxmi Sadan, Dadar East

Lapsed

by M/s. DOTOM Ventures · Dadar East, Mumbai 400014 · Map

Launched
Aug 20173 yrs 1 mth promised
Possession (MahaRERA)
Sep 2020Not extendedWhat does Lapsed mean?
Concrete structure
90%Mid-construction
Booked
10 of 1283%
Buildings
10.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

2 BHK
10
3 BHK
1
Other units
1
Total units
12
Buildings
1
Land
0.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)90%
Finishes, lifts and services10%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 90%Dec 2025: Concrete structure (RCC) 90%Jul 2026: Concrete structure (RCC) 90%Oct 2026: Concrete structure (RCC) 90%Dec 2024: Final finishes 10%Dec 2025: Final finishes 10%Jul 2026: Final finishes 10%Oct 2026: Final finishes 10%Excavation 100%Concrete structure (RCC) 90%Final finishes 10%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%90%10%10
100%90%10%–
100%90%10%–
100%90%10%10

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 3 similar projects in PIN 400014

Projects with up to 30 flats, launched within 6 months of this one.

Compared with 3 similar projects in PIN 400014
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs 1 mth5 yrs 4 mths
Possession date extendedNo2 of 3
Possession date (MahaRERA)Sep 2020Jun 2026
Concrete structure (RCC)90%100%
MahaRERA complaints (filed by or against the builder)00

The 3 projects

Other phases of this project are not included in the similar projects.

About this project

LS Laxmi Sadan by M/s. DOTOM Ventures is a 12-unit project in Dadar East, Mumbai 400014, launched in August 2017; its MahaRERA registration has lapsed. 10 units booked out of total 12 units. The concrete structure (RCC) is 90% complete.

Read full summary

LS Laxmi Sadan is a project by M/s. DOTOM Ventures in Dadar East, Mumbai 400014, registered with MahaRERA as P51900011117. It was launched in August 2017. It has 12 units in 1 building: 11 homes (2 and 3 BHK) and 1 other unit (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in September 2020. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 90% complete, final finishes 10% complete.

10 units booked out of total 12 units (83%).