- Launched
- Aug 20176 yrs 4 mths originally promised
- Possession (MahaRERA)
- Dec 2024Extended by 1 yrWhat does Lapsed mean?
- Concrete structure
- 67%Mid-construction
- Booked
- 60 of 6297%
- Buildings
- 30.4 acres
- MahaRERA complaints
- 9Filed by or against the builder
Shortlist 2 or more to compare side by side.
Project facts
- 1 RK
- 12
- 1 BHK
- 19
- 2 BHK
- 17
- 3 BHK
- 14
- Total units
- 62
- Buildings
- 3
- Land
- 0.4 acres
- Phases
- 1
- MahaRERA complaints
- 9
Construction progress
As reported by the builder to MahaRERA (whole project)
How construction has progressed
Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 67% | 67% | 57% | 60 | |
| 67% | 67% | 57% | – | |
| 100% | 100% | 85% | 60 |
"–" means MahaRERA shows no figure for that update.
Compared with 3 similar projects in PIN 400050
Projects with 30–150 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Launch to possession (as first promised) | 6 yrs 4 mths | 5 yrs 5 mths |
| Possession date extended | By 1 yr | 2 of 3 |
| Possession date (MahaRERA) | Dec 2024 | Dec 2026 |
| Concrete structure (RCC) | 67% | 36% |
| MahaRERA complaints (filed by or against the builder) | 9 | 0 |
The 3 projects
- Samyakth Bliss Tower B, Bandra West
- Residency, Bandra West
- Sandhu Palace, Bandra West
Other phases of this project are not included in the similar projects.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Samyakth Bliss Tower B | August 2017 | December 2026 | 36% | 0 units booked out of 21 units for sale |
| Residency | August 2017 | December 2022 | 0% | – |
| Sandhu Palace | July 2017 | Dec 2028 | 91% | – |
About this project
Marina by Keyhomes Realtors Private Limited is a 62-unit BMC-sanctioned project in Bandra West, Mumbai 400050, launched in August 2017; its MahaRERA registration has lapsed. 60 units booked out of total 62 units. The concrete structure (RCC) is 67% complete.
Read full summary
Marina is a BMC-sanctioned project by Keyhomes Realtors Private Limited in Bandra West, Mumbai 400050, registered with MahaRERA as P51900011605. It was launched in August 2017. It has 62 units in 3 buildings, with 1 RK, 1 BHK, 2 BHK and 3 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.
Possession was due in December 2024, after an extension of 1 year from the original December 2023. That date has passed and no further extension has been recorded. Construction: excavation 67% complete, structure (RCC) 67% complete, final finishes 57% complete.
60 units booked out of total 62 units (97%).