The Pavilion, Dadar West

Lapsed

by Heena Ramesh Chheda · Dadar West, Mumbai 400028 · Map

Launched
Dec 20223 yrs promised
Possession (MahaRERA)
Dec 2025Not extendedWhat does Lapsed mean?
Concrete structure
90%Mid-construction
Booked
16 of 2564%
Buildings
10.1 acres
MahaRERA complaints
0Filed by or against the builder
WhatsApp

Shortlist 2 or more to compare side by side.

Project facts

1 RK
1
1 BHK
13
2 BHK
1
3 BHK
3
4 BHK
7
Total units
25
Buildings
1
Land
0.1 acres
Phases
1
MahaRERA complaints
0

Construction progress

As reported by the builder to MahaRERA (whole project)

Excavation100%
Concrete structure (slabs)90%
Finishes, lifts and services0%

How construction has progressed

Each point is the progress shown on MahaRERA at that update. A line that stays flat means no new progress was reported between two dates.

Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2024Dec 2025Jul 2026Oct 2026Dec 2024: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Oct 2026: Excavation 100%Dec 2024: Concrete structure (RCC) 90%Dec 2025: Concrete structure (RCC) 90%Jul 2026: Concrete structure (RCC) 90%Oct 2026: Concrete structure (RCC) 90%Dec 2024: Final finishes 0%Dec 2025: Final finishes 0%Jul 2026: Final finishes 0%Oct 2026: Final finishes 0%Excavation 100%Concrete structure (RCC) 90%Final finishes 0%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%90%0%16
100%90%0%–
100%90%0%–
100%90%0%16

"–" means MahaRERA shows no figure for that update.

How to read construction stages

Compared with 5 similar projects in PIN 400028

Projects with 10–50 flats, launched within 6 months of this one.

Compared with 5 similar projects in PIN 400028
MeasureThis projectSimilar projects
Launch to possession (as first promised)3 yrs3 yrs 8 mths
Possession date extendedNo3 of 5
Possession date (MahaRERA)Dec 2025Dec 2026
Concrete structure (RCC)90%100%
Units booked64%44%
MahaRERA complaints (filed by or against the builder)00

The 5 projects

Other phases of this project are not included in the similar projects.

About this project

The Pavilion by Heena Ramesh Chheda is a 25-unit BMC-sanctioned project in Dadar West, Mumbai 400028, launched in December 2022; its MahaRERA registration has lapsed. 16 units booked out of total 25 units. The concrete structure (RCC) is 90% complete.

Read full summary

The Pavilion is a BMC-sanctioned project by Heena Ramesh Chheda in Dadar West, Mumbai 400028, registered with MahaRERA as P51900048161. It was launched in December 2022. It has 25 units in 1 building, with 1 RK, 1 BHK, 2 BHK, 3 BHK and 4 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.

Possession was due in December 2025. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) 90% complete, final finishes not started.

16 units booked out of total 25 units (64%).