Devanshi, Wadgaon Budruk
by Rajveer Construction. Wadgaon Budruk, Pune 411041. View on Google Maps
- Launched
- 2 years 11 months originally promised
- Possession date (MahaRERA)
- 2 months awayExtended by 1 year (originally December 2025). Why possession dates change
- Concrete structure (RCC)
- 90%Mid-construction
- Units booked
- 6 of 2921% booked
Project facts
| 2 BHK | 12 |
|---|---|
| 3 BHK | 16 |
| 4 BHK | 1 |
| Total units | 29 |
| Buildings | 1 |
| Land | 0.2 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 3 → 6 · structure 100% → 90% · possession date December 2025 → December 2026 · total units 20 → 29
Compared with 4 similar projects in PIN 411041
Projects with 10–60 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 2 yrs 11 mths | 3 yrs 5 mths |
| Possession date extended | By 1 year | 2 of 4 |
| Possession date (MahaRERA) | December 2026 | December 2027 |
| Concrete structure (RCC) complete | 90% | 74% |
| Share of units booked | 21% | 71% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Sumit Homes | January 2023 | October 2028 | 48% | Bookings not reported |
| Nakshatra | March 2023 | December 2027 | 100% | 30 of 34 booked (88%) |
| Sushila | May 2023 | March 2026 | 100% | 17 of 24 booked (71%) |
| Vasant Vihar A Wing | June 2023 | September 2026 | 5% | 8 of 40 booked (20%) |
Construction progress
As reported to MahaRERA at each updateIf a percentage drops between updates, we show it as MahaRERA reported it.
Updates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 90% | 0% | 6 | |
| 100% | 100% | 0% | 3 | |
| 100% | 100% | 0% | 2 | |
| 100% | 100% | 0% | 1 | |
| 100% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Devanshi (MahaRERA P52100048690) is a residential project by Rajveer Construction in Wadgaon Budruk, Pune 411041. It was launched in January 2023. It has 29 units in 1 building, with 2, 3 & 4 BHK homes as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, extended by 1 year from the original December 2025. Construction: excavation complete, structure (RCC) 90% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
6 of its 29 units are booked (21%). Since the December 2025 update, 3 more units have been booked, the reported concrete structure (RCC) has gone from 100% to 90% and the possession date has moved from December 2025 to December 2026.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.