Skip to main content
← Back

Venkatesh Erandwane Central Building A1

by Shree Venkatesh Buildcon PVT Ltd. Erandwane, Pune 411004. View on Google Maps

Launched
5 years 4 months promised
Possession date (MahaRERA)
5 months awayPossession date unchanged since launch
Concrete structure (RCC)
85%Mid-construction
Units booked
65 of 10463% booked
Price per sq ft (incl. balconies and terrace)
₹21,7002026 so far · 12 salesup 3% on 202580% of the 2026 sales we found were at this rate or lessSee what buyers paid

Project facts

2 BHK50
3 BHK52
Other units (shops, offices or not given by type)2
Total units104
Buildings1
Land1 acre
Complaints on MahaRERA (filed by or against the builder)1

Since Dec 2025: booked 64 → 65 · structure 60% → 85% · final finishes 10% → 12% · complaints 0 → 1

Share on WhatsApp

What buyers paid here

From government sale records

The price per sq ft is the agreed price of the flat alone, counting balconies and terrace.

Flat sizes and prices

Flat sizeWhat most buyers paid
1,150 – 1,230 sq ft₹2.18 – 2.68 crore

Based on flats sold in 2026 so far.

Price per sq ft, year by year

80% of the flats sold in each year went for this price or less.

2024₹20,900 per sq ft20 sales
2025up 1% on 2024₹21,100 per sq ft18 sales
2026 so farup 3% on 2025₹21,700 per sq ft12 sales

Rate vs other Erandwane projects, 2026: similar

Construction progress

As reported to MahaRERA at each update
Time used and structure built
4 years 11 months of the promised 5 years 4 months have passed
Concrete structure (RCC) 85% complete
Concrete structure (RCC)Final finishesExcavation
0%25%50%75%100%Dec 2023Jun 2024Dec 2024Jun 2025Dec 2025Jul 2026Dec 2023: Excavation 55%Jun 2024: Excavation 100%Dec 2024: Excavation 100%Jun 2025: Excavation 100%Dec 2025: Excavation 100%Jul 2026: Excavation 100%Dec 2023: Concrete structure (RCC) 0%Jun 2024: Concrete structure (RCC) 0%Dec 2024: Concrete structure (RCC) 0%Jun 2025: Concrete structure (RCC) 0%Dec 2025: Concrete structure (RCC) 60%Jul 2026: Concrete structure (RCC) 85%Dec 2023: Final finishes 0%Jun 2024: Final finishes 0%Dec 2024: Final finishes 0%Jun 2025: Final finishes 0%Dec 2025: Final finishes 10%Jul 2026: Final finishes 12%Excavation 100%Concrete structure (RCC) 85%Final finishes 12%

Updates reported to MahaRERA

Updates reported to MahaRERA, newest first
UpdateExcavationStructure (RCC)Final finishesUnits booked
100%85%12%65
100%60%10%64
100%0%0%47
100%0%0%26
55%0%0%—

"—" means MahaRERA shows no figure for that update.

Other phases of this project

About this project

Venkatesh Erandwane Central Building A1 (MahaRERA P52100031886) is a residential project by Shree Venkatesh Buildcon PVT Ltd in Erandwane, Pune 411004. It was launched in November 2021. It has 104 units in 1 building: 102 homes (2 & 3 BHK) and 2 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.

Its registered possession date is March 2027, unchanged since launch. Construction: excavation complete, structure (RCC) 85% complete, final finishes 12% complete. MahaRERA records do not show it as ready to move in.

65 of its 104 units are booked (63%). Since the December 2025 update, 1 more unit has been booked and the reported concrete structure (RCC) has gone from 60% to 85%. 80% of the 2026 (so far) sales we found here were at ₹21,700 per sq ft or less (up 3% on 2025), counting balconies and terrace in the size, based on 12 registered sales. Buyers here paid a rate similar to other Erandwane projects in 2026. Most buyers paid ₹2.18–2.68 crore for flats of 1,150–1,230 sq ft.

Disclaimers
  • Figures are as reported to MahaRERA, not verified by FlatNama.
  • Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
  • On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
  • Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
  • Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
  • Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
  • Rates also vary with the exact project location.
  • Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
  • Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
  • Please do your own checks before you buy.
Source: MahaRERA registration P52100031886.Check it on MahaRERA (P52100031886)All projects in Deccan