Aleria - Block B, Kharadi
Lapsed
by Kolte-Patil Developers Limited. Kharadi, Pune 411014. View on Google Maps
- Launched
- 2 years 8 months promised
- Possession date (MahaRERA)
- 4 months ago. No extension recordedPossession date unchanged since launch. What "Lapsed" means
- Concrete structure (RCC)
- 100%Nearing possession
- Units booked
- All booked27 units booked
Project facts
| 2 BHK | 27 |
|---|---|
| Total units | 27 |
| Buildings | 1 |
| Land | 0.1 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 23 → 27
Compared with 5 similar projects in PIN 411014
Projects with 10–60 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 2 yrs 8 mths | 4 yrs 2 mths |
| Possession date extended | No | 0 of 5 |
| Possession date passed | Yes, due June 2026 | 2 ready to move; 0 also past their date |
| Concrete structure (RCC) complete | 100% | 100% |
| Share of units booked | 100% | 82% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| Kumar Periwinkle-wing B3 | October 2023 | December 2027 | 100% | 26 of 27 booked (96%) |
| Titan Tower | October 2023 | December 2027 | 50% | 2 of 17 booked (12%) |
| Kumar Palaash A2 | November 2023 | October 2028 | 100% | All 35 units booked |
| Spandan | December 2023 | October 2026 | 95% | 9 of 24 booked (38%) |
| 38K Inclusive Housing | April 2023 | December 2026 | 100% | 41 of 50 booked (82%) |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 100% | 0% | 27 | |
| 100% | 100% | 0% | 23 | |
| 100% | 30% | 0% | — | |
| 100% | 0% | 0% | — | |
| 0% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Aleria - Block B (MahaRERA P52100053031) is a residential project by Kolte-Patil Developers Limited in Kharadi, Pune 411014. It was launched in October 2023. It has 27 units in 1 building, with 2 BHK homes as registered with MahaRERA. Its MahaRERA status is Lapsed.
Possession was due in June 2026. That date has passed and no extension has been recorded. Construction: excavation complete, structure (RCC) complete, final finishes not started. MahaRERA records do not show it as ready to move in.
All 27 units are booked. Since the December 2025 update, 4 more units have been booked.
Kolte Patil's track record in Pune
MahaRERA projects registered 2017–2026, in the 59 areas FlatNama covers
| Projects registered with MahaRERA | 63 |
|---|---|
| Completed without extending the possession date | 11 |
| Completed after an extension, or lapsed | 17 |
| Under construction | 35 |
| Possession date extended by the builder | 4 |
| Typical time from launch to 100% structure | 3 years |
| Complaints on MahaRERA, all Kolte Patil projects | 100 (28 of 63 projects) |
- Completed without extending the possession date: MahaRERA shows the project Completed and the builder did not extend its possession date. MahaRERA's COVID extensions (6 + 6 months, 2020–21) are not counted as the builder's.
- Completed after an extension, or lapsed: every other registration that is not under construction.
- Under construction: MahaRERA status Active.
- Possession date extended by the builder: counted across all of the above, so it overlaps them.
- Typical time from launch to 100% structure: the middle value for projects whose concrete structure reached 100% between December 2023 and July 2026, counted from registration.
- Complaints: complaints on MahaRERA filed by or against the builder, on all its projects.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.