Highlife Survey NO 56/3/37/1P , 56/3/26/3 at Wadgaonsheri, Vadgaon Sheri
by RM Group. Vadgaon Sheri, Pune 411014. View on Google Maps
- Launched
- 1 year 7 months originally promised
- Possession date (MahaRERA)
- 2 months awayExtended by 1 year (originally December 2025). Why possession dates change
- Concrete structure (RCC)
- 45%Mid-construction
- Units booked
- 5 of 3415% booked
Project facts
| 2 BHK | 2 |
|---|---|
| 3 BHK | 10 |
| 4 BHK | 4 |
| 5+ BHK | 8 |
| Other units (shops, offices or not given by type) | 10 |
| Total units | 34 |
| Buildings | 1 |
| Land | 0.2 acres |
| Complaints on MahaRERA (filed by or against the builder) | 0 |
Since Dec 2025: booked 2 → 5 · possession date December 2025 → December 2026 · total units 20 → 34
Compared with 6 similar projects in PIN 411014
Projects with 10–50 flats, launched within 6 months of this one.
| Measure | This project | Similar projects |
|---|---|---|
| Promised timeline (launch to possession) | 1 yr 7 mths | 3 yrs 4 mths |
| Possession date extended | By 1 year | 1 of 6 |
| Possession date (MahaRERA) | December 2026 | January 2028 |
| Concrete structure (RCC) complete | 45% | 68% |
| Share of units booked | 15% | 53% |
| Complaints on MahaRERA (filed by or against the builder) | 0 | 0 |
"Similar projects" shows the typical (middle) value. Other phases of this project are not included.
| Project | Launched | Possession date (MahaRERA) | Concrete structure (RCC) | Units booked |
|---|---|---|---|---|
| VJ IndiLife Kharadi | May 2024 | December 2028 | 70% | 813 of 835 booked (97%) |
| Vishalleela Residency | April 2024 | March 2027 | 40% | 8 of 24 booked (33%) |
| Rudrakshum Residency | June 2024 | March 2028 | 67% | 10 of 19 booked (53%) |
| Ayodhyaa Niwaas | April 2024 | December 2027 | 16% | 3 of 38 booked (8%) |
| Samruddhi | August 2024 | December 2026 | 100% | Bookings not reported |
| Kumar Palaash A2 | November 2023 | October 2028 | 100% | All 35 units booked |
Construction progress
As reported to MahaRERA at each updateUpdates reported to MahaRERA
| Update | Excavation | Structure (RCC) | Final finishes | Units booked |
|---|---|---|---|---|
| 100% | 45% | 0% | 5 | |
| 100% | 45% | 0% | 2 | |
| 100% | 45% | 0% | 1 | |
| 100% | 0% | 0% | — |
"—" means MahaRERA shows no figure for that update.
About this project
Highlife Survey NO 56/3/37/1P , 56/3/26/3 at Wadgaonsheri (MahaRERA P52100056118) is a residential project by RM Group in Vadgaon Sheri, Pune 411014. It was launched in May 2024. It has 34 units in 1 building: 24 homes (2, 3, 4 & 5+ BHK) and 10 other units (shops, offices or not given by type), as registered with MahaRERA. Its MahaRERA status is Active.
Its registered possession date is December 2026, extended by 1 year from the original December 2025. Construction: excavation complete, structure (RCC) 45% complete, final finishes not started. MahaRERA records do not show it as ready to move in.
5 of its 34 units are booked (15%). Since the December 2025 update, 3 more units have been booked and the possession date has moved from December 2025 to December 2026.
Disclaimers
- Figures are as reported to MahaRERA, not verified by FlatNama.
- Concrete structure (RCC) is the reinforced-concrete frame. Final finishes means lifts, services, common areas and other works needed before handover, not the finishes inside each flat.
- On MahaRERA, Lapsed means the registered possession date has passed and the developer has not filed an extension or recorded the project as complete. It does not by itself mean work has stopped.
- Total internal area = carpet + balcony + terrace, as Pune sales offices quote “carpet area”. Price per sq ft counts balconies and terrace in the size.
- Prices are of the flat alone; stamp duty, registration and GST are extra, so the total is usually 10–15% more.
- Prices in a project usually rise as construction progresses. Floor, view and flat size move the price up or down, so treat these figures as a guide.
- Rates also vary with the exact project location.
- Prices come from sale records obtained from IGR Maharashtra, which may not include every sale.
- Complaints are the count MahaRERA shows for the project; they include complaints filed by the builder against buyers.
- Please do your own checks before you buy.